- AES Mechanical was contracted to perform the removal and replacement of 62 RTUs on the Walmart corporate offices.
- Offices housed the Walmart management team along with their large meeting auditorium and cafeteria.
- Replacement of the 63 Units happened in a one-day, 10-hour shutdown of the associated complex.
- AES Mechanical was the first contractor to shut down this facility to prevent Walmart associates from working.
- Project consisted of the removal of 63 RTUs, installation of 40 adapter curbs and Installation of 63 new RTUs.
- Zero accidents.
- Rewired HVAC control system for 41 units.
- External duct and layout.
- Gas pipe disconnect/reconnect.
- Extensive coordination between AES, Walmart, maintenance, helicopter personnel, adjacent airport.